Flow valve installation

    ① After the arrival of the goods should be properly stored, to avoid rain, stored in a dry place; ② should be installed according to the direction of the water flow arrow shown by the valve body, do not install the anti; ③ In the pipe can be mounted vertically or horizontally; ④ flow settings Set method: With a special wrench, open the protective screw, rotate the stem, so that the scale line to set the corresponding value of the flow; ⑤ flow valve does not have off function, according to need, should be set off the valve. More Keyword Search: Flow Valve

    Garage Equipment

    Garage Equipment,Auto Garage Equipment,CE Approved Garage Equipment

    Ningbo Heyu Tire Repairs Co., Ltd. , https://www.auto-repairs-tools.com

    Previous Post: High Quality Aluminum Truck Tool Box (8)
    Next Post: SKF Full Ceramic Bearing 6205 Very High Temperature Sic Ceramic Bearing 1200c
    Home
    Recent Posts
    • Sucker Mount Deck Dash Police Lights (TBF-3868L-…
    • Stainless Steel 304/316 Spring Nut for Machine a…
    • Stainless Steel Flange Nylon Insert Lock Nut
    • Nylon Insert Hex Flange Lock Nuts
    • Development status and countermeasures of grain …
    • Stainless Steel 304 316 Hexagon  Nut  with  F…
    • dB Peripheral Garden Sprinkling Water Pump
    • Stainless Steel Stirrup Bolts U Bolts with ISO S…
    • Future development of light trucks - high-end mo…
    • Jaw crusher blocking material solution
    • Heavy Hex Structural Bolts ASTM A325 Type 1 with…
    • Stainless Steel/Carbon Steel Nylon Insert Hex Fl…
    • Absolute Steady Highway Guardrail Roll Forming M…
    • Stainless Steel Hex Head Flange Nylon Insert Loc…
    • Hot Sale Special Nut High Quality (YD-SN415)
    • Us Type Drop Forged Self Colored Shoulder Eye Bo…
    • Intelligent distribution system innovation break…
    • Second brother Sa Huan on the highway
    • ASTM A325 Heavy Hex Stud Bolts and Nuts
    • Stainless Steel Threaded Rod/Threaded Bar/Stud B…