Henderson molybdenum mine heavy truck uphill

    The Henderson Molybdenum Mine is a large-scale mine that was completed and put into operation in the United States in the 1970s. It is a mining and mining enterprise with a daily output of 27,000 tons of ore.
    The deposit has a length of 900m, a thickness of 120-240m, and an average grade of MoS 2 of 0.49%.
    Mining terrain, due to large-scale beneficiation plant, there is not enough industrial sites near the mine, processing plant had built in place across the Atlantic from the Pacific watershed of mine 22.5km. The elevation of the plant is 2,743m, and the elevation of the main flat shaft is 2,286m, so it can only be transported uphill by Changping.
    The main flat ore transport layer considers two options: one is rail transport; the other is belt conveyor transport. Compared with the scheme, the latter has a transportation cost higher than the former by US$0.02/ton; and an underground crushing and dust removal device is required; the flat section has a large section, and in addition to the steel rope conveyor, the auxiliary vehicle is also required. It was therefore decided to use rail transport. A double track with a gauge of 1040 mm is laid in the flat. It is 5m wide, 4.6m high and 15.8km long (Fig. 1).

    Figure 1 Henderson molybdenum mine flat development system diagram
    1-outlet well; 2-second well; 3-intake well; 4-wind well;
    5-硐口; 6-concentration plant; 7-train group
    A total of three shafts were drilled in the mine. Well No. 1 was an outflow well, and No. 3 was an inlet well with an internal diameter of 7 m. Both wells were drilled to a level of 2469m, with a depth of 744m and 698m respectively. Well 2 is used to upgrade personnel, equipment and materials. The net diameter of the wellbore is 8.5m and the depth of the well is 946m. Connected with the 2286m main level. There are 114-person double-layer cages in the wellbore and a large cage with a load of 20t and a bottom area of ​​7.3×2.7m for lifting large-scale equipment such as dump trucks and scrapers. Both cages are equipped with counterweights. There is also a small cage for wellbore maintenance. Each stage is connected by a ramp. [next]
       
    The main level boring is divided into two working faces to perform relative operations. The west section is 11km long and is driven downhill from the surface to the east with trackless equipment. The eastern section is 4.8km long and is used to dig up the west uphill with rail equipment.
       
    Due to the high ground temperature (37°~42°C), in order to improve the ventilation conditions, a No. 4 well with a diameter of 4.3m and a depth of 483m was drilled in the middle of the main flat, and two 370kw fan fans were installed at the wellhead.
    See Table 1 for examples of Pingyi development.
    Table 1
    Mine name
    Deposit element
    Production capacity of 10,000 tons / year
    Mainly develop roadway location
    Main level
    Slip
    Auxiliary vertical (oblique) well
    Note
    Going long (m)
    Extension (m)
    inclination
    (°)
    Thickness (m)
    Number of pieces
    Section
    Length (m)
    Number of pieces
    Section
    Length (m)
    Number of pieces
    Section (m 2 )
    Length (m)
    Qijiang Whitehead Lake iron ore
    400~
    900
    1100
    33~
    36
    0.7~
    2.97
    10.5
    Lower plate
    1
    Width × height 2.6 × 2.75m
    1039.
    4
    Inclined well 3
    4.93
    5.34
    420
    453
    400
    1 upper inclined well and 2 middle inclined wells
    Minjiang Daloba Iron Mine
    1000
    600
    18~
    twenty two
    2.0
    25.5
    Intrapulse
    1
    Double Lane: 3.78
    208
    1 inclined well
    5.64
    621
    Tianhu Iron Mine Zhaojiazhong Mining Area
    200~
    1000
    202
    40
    1.69
    10
    Lower plate
    1 inclined well
    8.57
    400
    Pangjiabao Iron Mine
    8600
    Vertical depth 350
    25~ 35
    I layer mine 1.87;
    250
    Lower plate
    The first section of the second section of the third section of the third section of the slippery well
    22~
    2.5m
    2×2m
    270
    270
    270
    Three sections
    Two paragraphs
    One blind oblique well two blind oblique well three blind oblique well four blind oblique well five blind oblique well
    446
    422
    416
    533
    Three-stage slide
    II layer mine 1.35
    On the plate
    1
    13.0
    m 2
    1860
    III layer mine 0.8
    Lower plate
    1
    12.68
    m 2
    5100
    Xiangdong Qingshui Iron Mine
    3400
    800
    25~ 75
    1.51
    20
    flank
    1
    7.09
    m 2
    4256
    1
    1.8×2m
    62
    1
    5.06
    150
    The main flat and the water mine share
    Longquan lead zinc ore
    350
    0~ 42
    4.0~
    43. 9 average 16.54
    13.2
    Lower plate
    1
    5.58m 2
    9.89m 2
    394.
    32
    1
    2.52.5
    m
    140
    Ground roads are connected to the middle section of the mouth
    Shizhuyuan metal ore
    600~
    980
    About 300
    10~ 15
    100~
    200 thickest 300
    99
    Lower plate
    1
    12.03 m 2
    14.73 m 2
    2081.
    twenty four
    4
    33m
    Two 110
    Two 178
    a ramp
    11.
    twenty two
    1176
    .
    Wuchuan mercury mines
    2700
    ~
    4300
    400
    10~ 25
    45~ 80
    0.31 ~ 12.35
    6.6
    Lower plate
    1
    5.6m 2
    1010
    3
    2.52.5
    m
    170
    55
    130
    Is expanding to 132,000 tons / year
    Tin Tieshan Lead-Zinc Mine
    850~
    1365
    628
    60~ 80
    4~16
    100
    Lower plate
    1
    13.88 m 2
    1050
    2
    7.07
    m 2
    160×2
    Surface roads pass through all stages
    Shaanxi Silver Hole silver galena
    550
    727
    30~ 45
    4
    10
    Lower plate
    1
    5.6m 2
    418
    1
    7.06
    m 2
    120
    Ibid.
    Shaanxi Yinmu Temple Lead-Zinc Mine
    250~
    90
    350
    73~ 85
    3
    6.6
    Lower plate
    1
    Net.11
    m 2
    Digging 6.11m 2
    391.9
    1
    12.
    57
    222.
    7
    Kaiyang phosphorus ore
    4600
    1100
    30~ 45
    6~7
    100
    Lower plate
    1
    11.8 m 2
    510
    4
    7.07
    m 2
    40
    80
    160
    200
    Inclined well 4
    4.3
    208×4
    Hubei Wangji Phosphate Mine
    4200
    25~ 38
    8
    150
    1st district in the south
    Central District 1
    8.6m 2
    8.6~ 9.0m 2
    1200
    1500
    3
    3
    4.91
    m 2
    4.91
    m 2
    90
    60
    30
    90
    90
    30
    Sichuan Jinhe Phosphate Mine
    2300
    500
    8~ 23
    6~10
    50
    1
    8.55
    m 2
    395
    2
    3.14
    m 2
    4m 2
    35
    69
    Surface ramp
    Inner Mongolia charcoal kiln pyrite
    1770
    500
    56
    6.64
    50
    1
    8.2~ 12.5
    m 2
    1460
    3
    4.8
    m 2
    100
    741-1
    2100
    300
    60~ 70
    1~2
    8
    Lower plate
    1
    4.77
    m 2
    650
    1
    44m
    209
    743-1
    500
    250
    65~ 80
    1~ 1.5
    3
    Along the way down
    1
    6.05
    m 2
    370
    1
    5.59
    150
    Pine tree tin mine
    245~
    910
    220~ 450
    10~ 15
    2~ 10
    49.5
    Lower plate
    1
    5.07~ 10.78 m 2
    2397
    4
    2.32.3
    m
    175~
    200
    2
    4.14.1
    ~
    4.6m
    191~
    219m
    Dongchuan Mining Bureau
    1000
    ~
    1500
    1500 ~ 1944
    15~ 18
    2.4~ 4.1
    26.4
    Lower plate
    1
    2.65~ 2.6m 2
    1440
    6
    2.32.3
    m
    20~
    150
    1
    2.5×3.5m
    197
    Easy Gate Lion Copper Mine
    30~
    325
    20~ 600
    64~ 82
    1~ 30.9
    59.4
    Lower plate
    1
    5.86~ 6.04
    m 2
    1443 (single length)
    1
    2.52.5
    ~3.5
    m
    293
    1
    4.24.2
    m
    260
    Yimen Shishan Mine
    680~
    900
    600
    60~ 25
    18~ 22
    69.3
    Lower plate
    1
    5.31~ 11.81
    m 2
    2089
    2
    2.02.0
    m
    100~
    150
    1
    5.55.5
    m
    250

    Door And Window Fittings

    Door And Window Fittings,Aluminum Door And Window Fittings,Die Casting Door And Window Fittings,Aluminum Die Casting Door And Window Fittings

    Ningbo Beilun Huari Metal Products Co., Ltd. , http://www.huari-metal.com

    Previous Post: Basic knowledge of mineral floatability classification
    Next Post: Application and discussion of talc deep processing equipment
    Home
    Recent Posts
    • Study on Beneficiation Process of Ilmenite in a …
    • Molybdenum ore oxidation and molybdenum ore in a…
    • General requirements for technical conditions fo…
    • Basic structure and working principle of externa…
    • Production of titanium dioxide by sulfuric acid …
    • Method for separating copper and sulfur in coppe…
    • Technology for preparing ferric sulfate by calci…
    • Darwin silver tailings granulation heap leaching…
    • Combination of collectors
    • Lithium, tantalum, niobium and tantalum ore indu…
    • Labor productivity
    • Non-ferrous metal processing product code repres…
    • Separation test between siderite and hematite
    • Pretreatment process for refractory ores and con…
    • Comprehensive utilization technology method and …
    • Several theoretical studies on copper oxide ore …
    • Production of Titanium Dioxide by Sulfuric Acid …
    • Anion reverse flotation process
    • Hydrotalcite introduction
    • Uniaxial compressive strength of rock and its de…