Metal Deck Roll Forming Machine

    Model NO.: YX75-187.5-750
    Forging Forming Method: Roll Forming
    Export Markets: Global
    Type: Roll Forming Machinery
    Method: Roll Forming
    Processing: Roll Forming
    Product: Metal Deck
    Brick Raw Material: Metal
    Automation: Automatic
    Trademark: SAIBO
    Transport Package: Sea Packing
    Specification: CE SGS
    Origin: Suzhou, China
    HS Code: 8455221000
    Metal Deck Roll Forming Machine
    1. Profile drawing:

    Metal Deck Roll Forming Machine
    2. The Chart of Process Flow
    Metal Deck Roll Forming Machine
    3. Main Specification
    Item NO  
    Description
     
    Offered specification
      Roll Forming Machine YX75-187.5-750
      Rolling Speed 12-15m/min(not include cutting time)
     
      Rolling Thickness 0.8-1.5mm
      Control System PLC  (Panasonic) as list in the note
      Un Coiler 5 ton manual de-coiler
      Roller Stations About 36 stations
      Roller Material 45# forge steel, coated with chrome
      Shaft Material and DIA ¢85mm, material is 45# forge steel
      Maim Motor Power 22kw (two 11KW)
      Hydraulic Station Power 7.5kw
      Hydraulic Pressure 12Mpa
      Material Of Cutting Cr12Mov quenching 58-62ºC
      Material Of The Stations Cast iron
      Tolerance 3m+-1.5mm
      Electric Source 380V, 50HZ,3 phase
    Also can satisfy customer's require
      Way Of Drive 1.2 inch double chain
      Color Of The Machine Yellow and blue
      Size of the machine L*W*H   around 16m*1.7m*1.6m
      Container Need 2 x40 feet
    4. Packing & Delivery
    Deliver time: take goods after receive deposit 60 days
    Packing: suitable of ocean transportation

    5. Warranty
    Warranty: 1 year warranty from date of shipment
    Guarantee:
    1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
    2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
    -  Damage occurs due to a natural disaster
    -  Malfunction occurs due to user error
    -  Malfunction occurs due to modifications
    -  Malfunction occurs due to further movement or shipment after installation
    3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
     
    6. Payment Term
       30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

    ATTENTION: The profile of the panel is according to the clients!

    Motor Accessories

    Motor Accessories,Motor Parts,Dc Motor Accessories,Food Machinery Parts

    DONGYING SHENGYU METAL PRODUCT CO.,LTD , https://www.shengyucasting.com

    Previous Post: The booming German wind power
    Next Post: Honeywell: Let "Oriental Serve the East"
    Home
    Recent Posts
    • Pehd Granule Extrusion Equipment Plastic Recycli…
    • Recycling Plastic PC/PP/PE Scrap Extruder Pellet…
    • Engine Oil Cleaner for Car Care
    • 1.40L Universal Windshield Washer Bottle for Pas…
    • Engine Parts Washer Ultrasonic Cleaner
    • Hho Generator Clean Motorcycle Engine Carbon Dep…
    • 10kg Fully Closed Perc Commercial Dry Cleaner
    • Good Quality TM240A Pick and Place Machine From …
    • Bench Top Spray Gun Holder for Auto Painting Sho…
    • Hardened Steel Flat Washers with High Quality
    • Pingyang Heavy Industry will build the bracket w…
    • OEM Electrical Insulation Plastic Seal Ring Gask…
    • Why is the microwave sludge dryer so hot?
    • Auto Crown Wheel and Pinion Gear
    • Wang Feng, National People's Congress Deputy…
    • Stability analysis of surrounding rock of a tung…
    • Talking about the Current Development of Flowmet…
    • Toyota Hiace ambulance has five advantages worth…
    • Air Duct Forming Machine for Ventilation Pipe Du…
    • Bracket for Highway Guardrail Roll Forming Machi…