Electronic fence system installation and construction process

    First, the installation angle and tilt direction
    According to the site conditions and Party A's requirements, determine the installation angle and direction of the perimeter fence .
    Second, the assembly of bearing rods and bearing rod insulators
    The bearing rod insulator is fixed on the bearing rod with a self-tapping screw, and the directions are the same.
    Third, the assembly of terminal rod and terminal rod insulator
    1. First, fix the terminal insulator on the terminal rod with the terminal insulator clip to ensure the same direction. Use terminal rod insulators and terminal rods skillfully when turning or falling.
    2. Fix the terminal rod between two universal bases with bolts.
    3. Where there is a fence controller, one or two (mutually perpendicular) arrester attachments should be added at the top of the terminal rod.
    Fourth, the use of intermediate tightener instructions
    The middle tensioner is always hung on the front end fence. When the alloy wire is installed, the alloy wire is inserted into the round hole on the side of the middle tightener, and then aligned and passed through the middle gap in the middle, and finally passes through the other side. Hole out of the hole.
    V. Installation of fence terminal rods
    1. Determine the specific position of the fence strut: Drill holes in the top of the wall with a percussive drill and fix the strut in a suitable position with M10×100 powerful expansion bolts.
    2. Place a middle bearing rod every 5 meters, and install the middle bearing rod in other necessary positions.
    3. Each corner includes the two ends of the zone. When 100 meters or other pulling force is relatively large and necessary, the terminal rod is installed. The partition should be installed with insulators installed in two directions.
    Sixth, arrester installation
    Firstly, the lightning arrester is fixed on the mounting bracket through the nut on the lightning arrester. The lightning arrester is usually installed on the top of the pulse host, and a lightning arrester is installed in each zone.
    Seven, fence line installation principles and installation points
    1. Principle
    (1) A zone is a series loop, and it must be connected in series from the host to the electronic fence. At the jumper of the wire, it must be connected with a high voltage wire to avoid gaps or short circuits.
    (2) The electronic fence grounding point is generally selected at the end. When the arrester is a lightning arrester, the grounding point of the arrester should be set at the beginning of the electronic fence.
    (3) Strong electric current and lightning arrester must have good grounding, and the grounding resistance is <10Ω.
    (4) Strong and weak ground must be separated and ≥4m.
    2, installation points
    (1) The installation method of fences should be selected in the way of subsection installation. The same line or the same defense zone is recommended to be divided into one section. Network cables not on the same line are installed several times.
    (2) Spreading the alloy wire: Use a pay-off frame or a suitable method to put the wire. To avoid knotting and unevenness, it is not allowed to put it loosely. Four can be displayed at the same time, but no crossover can occur.
    (3) Tight line: One end of the alloy wire is fixed on the end terminal rod insulator with a wire connector, and then four alloy wires are placed in the wire trough of the bearing rod insulator or the middle rod insulator, and finally passed through tightly. The threader pulls the alloy wire tightly and is fixed to the terminal rod insulator at the other end with a wire connector. Then adjust the tightener so that the 4 lines are both tight and parallel to each other. Parallel multiple lines should be tightened at the same time.
    Eight, grounding
    A grounding body must be driven under each host. A grounding body should be installed every 100m. The grounding body is larger than 40×40×4×1500mm (with M10 or more grounding bolts or holes). Standard galvanized grounding iron, vertical Into the ground, and the grounding body and the arrester bracket, booster grounding terminal for reliable connection, grounding resistance should be <10Ω, when not meet the requirements can be added to reduce resistance to meet the requirements. Strong grounding and weak grounding must be isolated from each other and must have a distance of >4m.


    Air Ride Compressor for BMW 5 Series E61 X5 E70 X6 E70 E71 Air Bag Suspension Pump

     

    Quick Details:

     

    Description: Air Ride Compressor for BMW 5 Series E61 X5 E70 X6 E70 E71 Air Bag Suspension Pump 
      

    Model: For BMW X5 E70 X6 E71 E72 5 Series E61 37206789938 37226775479 37226785506 

     

    OEM: 37206789938 37226775479 37226785506

     

    Other Part Number: BMW Air Suspension Compressor, Air Suspension Pump for BMW X5 X6, Compressor Air Suspension, Air Compressor for BMW Air Suspension, BMW X5 X6 Air Spring Compressor

     

    Condition: Genuine Remanufactured

     

    Material: Rubber Steel Aluminum

      

    Application:  For BMW X5 E70 X6 E71 E72 5 Series E61

     

    Warranty: 14 months

     

    Delivery: 3-7 days after receiving payment

     

    Gross Weight: 6kg

    Product Description

    Item Auto parts Air Suspension Compressor
    Application   For BMW 5 + 7 Series AND X5 E53 E39 E65 
    Warranty   12 months 
    OEM 37226787616/4154031000/37 22 6 778 773/37226778773
    Brand   Jovoll
    Payment term Paypal ,T/T, Western union ,Money Gram ,L/C ,D/P ,Cash 
    Pacakage Exporting standard packed
    Delivery time Within 3  days after confirming payment
    MOQ 1PCS
    Shipping DHL,UPS,FEDEX or as customers' requirements.
    Main market European countries , Middle-east ,East south Asian , American and some in African    


    Air Compressor For BMW

    Air Compressor For BMW,Air Suspension Compressor Pump,Air Suspension Compressor For BMW,Air Compressor For BMW Car

    Hangzhou Hanray Industry Co., Ltd , https://www.aircompressor.pl

    Previous Post: Handan City Grain Drying Center 203 dryers serve 450,000 mu crops
    Next Post: Starting from the "core", Activating the world of Mercedes-Benz powertrain Asia Tour shines in Xiamen
    Home
    Recent Posts
    • High-efficiency energy-saving high-pressure diap…
    • Development and Reform Commission: Prevent Blind…
    • New igus wheeled towline with plain bearings for…
    • Has L4 unmanned technology been implemented in C…
    • Wear and anti-corrosion repair with ceramic shee…
    • Four steps to select the dust bag and dust colle…
    • What issues should I pay attention to when maint…
    • ·The price of refined oil products will be lowe…
    • Beijing Auto Show Highlights: Plug-in of traditi…
    • Portable cable press machine tips
    • The best five car brands of the engine, Toyota s…
    • [Meter's Latest Patent] A method of checking…
    • The first shield zone of the No. 1 shield machin…
    • ·Guangzhou Honda Automobile Co., Ltd. expanded …
    • ·Andorto's high-end brand RECARO set up a s…
    • Facing Ice and Snow, Let's Have a Look at th…
    • Nine and five tree-cutting machines, a good help…
    • Discussion on Technical Problems and Solutions i…
    • Port of Rotterdam in the Netherlands is using Io…
    • Dongfeng Cummins ISZ enters the blank market 201…