As more and more vehicle owners have converted cars into "sanitation garbage trucks, sprinklers, and suction trucks, etc.," the potential safety risks have also increased substantially. Some of the irregular modifications have led to a decrease in the service life of the car. The following garbage truck manufacturers introduce some ten tips for garbage truck modification.
1. After the chassis has been modified, the axle load on the front and rear axles must not exceed the maximum axle load quality allowed on the chassis.
The total mass of the second and third rounds of garbage truck products shall not be greater than the maximum load quality calibrated by the chassis used, nor shall it be less than 90% of the maximum allowable total mass.
Third, all modified vehicles and changes to garbage trucks should be implemented in accordance with the current national regulations.
Fourth, the refitting manufacturers shall be responsible for the design, manufacture and safety of all refitting devices; and shall be responsible for the correctness of connection between the refitting part and the chassis carrying system and the power output system, and shall not affect the entire car due to the general layout design of the refitting part. safety.
5. The conversion plant shall not dismantle, change, weaken and destroy the original structural components of the chassis for the purpose of installing the modified parts, or cause the chassis to be heavily loaded with stress concentration.
Sixth, the modified part should have enough space for maintenance, so that the relevant parts of the inspection, maintenance, lubrication, replacement and disassembly have a good proximity. When necessary, the compartment car chassis must have a corresponding maintenance activity cover.
7. After the refitted vehicle is driving on the vehicle, and the refitting part is in any motion state, it shall be ensured that friction, collision and interference do not occur between the refitting part and the original chassis member.
8. Pay attention to reduce the height of the center of gravity of the converted part (including the bearing quality) as much as possible and ensure that the axle load distribution of each axis does not exceed the maximum allowable shaft load of the plant to avoid the eccentric load between each axis and the left and right wheels.
9. When the selected chassis is a turnable cab, the cab shall be smoothly turned after the conversion.
10. It is not allowed to affect the running brake and steering performance of sanitation vehicles due to modification.
Roof and Wall Panel Roll Forming Machine
Roof and Wall Panel are widely used in building: the steel-structured large-scale warehouses, plants, supermarkets,
shopping malls, trade markets, stadiums, holiday villages, sanatoriums, hotels, villas, residences, and different kinds of
greenhouses. What's more, equipment can be designed and manufactured as customers' requests.
No. |
Item Name |
Lead Time |
Package |
Qty. |
Price/USD FOB Tianjin |
1 |
45 working Days |
40` Container |
1 Set |
8800 |
Roof and Wall Panel Roll Forming Machine Production process
Uncoiling→Feeding material into machine→Roll forming→Measuring length→ Auto cutting→Products
receiving
With the work process of roof and wall panel roll forming machine, we will provide other accessories like
one set Manual Decoiler, one set PLC control station, one oil pump and one set product collect table.
Equipment and Qty. |
|
Decoiler |
1 set |
Main roll forming machine |
1 set |
PLC control station |
1 set |
Hydraulic station |
1 set |
Post cut |
1 set |
Electric motor |
1 set |
Runout table |
1 set |
Processing material: colored steel plate, galvanized plate.
Material thickness: 0.3- 0.8 mm
Material hardness: 195 mpa---350 mpa
Formed width:1015 mm
Forming speed: 12 m/minLoading capacity:5 T
Uncoiling width:1200 mm
Inner diameter: 450-550 mmSize of the main part: about 7500 Ñ… 1650 Ñ… 1500
Weight of main part: 3. 5 tons
Voltage: 240 V/50 HZ 3 Phase or as your required
Roller fixer : middle plate
Frame : 350 mm H beam steel welded
Drive mode: case of differential
Material of rollers: 45# steel, surface hard chromium platingMaterial of shafts: 45# steel
Diameter of shafts: φ 80 mm
Number of rollers : 13 rollers
Main power: 5.5 kwPayment terms
Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment.
Delivery:within 45 working days after receipt of deposit.Warranty
1. Two years guarantee, and we will provide the technical support for the whole life.
2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary, one technician needed.
4. Training time: one week (contains the time of installation and adjustment)
Except the this,we also supply the Wall Partition Roll Forming Machine.
Roof and Wall Panel Roll Forming Machine
Wall and Roof Roll Forming Machine,Roof Roll Forming Machine,Wall Roll Forming Machine,Wall Partition Roll Forming Machine
Zhongtuo Roll Forming Machinery Co., ltd , https://www.rollsformingmachines.com