    The mining development project must be followed in the whole process from the initiation of the project, the construction of the project to the completion of the project. It reflects the intrinsic link of capital construction work and is a code of conduct that must be followed by the departments and personnel involved in mining development. The procedures for mining development cannot be arbitrarily reversed, but they can be reasonably crossed.
    A mining development project (mainly large and medium-sized mining projects) generally goes through the following stages:
    1) According to the long-term planning of national economic and social development and the market demand for products, based on the regional, industry planning and mineral resources, based on the existing productivity layout, propose project proposals (or prepare project pre-feasibility study report) ).
    2) The project proposal (or pre-research report) can be selected for feasibility study and prepared project feasibility study report after being selected and balanced by the comprehensive department and included in the preliminary work plan.
    3) The feasibility study considers the feasible project, and prepares the plan and task book according to the suggestions of the proposed plan approved by the higher level.
    4) After the plan task book is approved, carry out preliminary design, prepare the preliminary design specification of the project, propose the general estimate of the construction project and prepare the project budget statement.
    5) Approved preliminary design and total budget estimates are included in the capital construction annual plan after comprehensive balance by the planning department.
    6) Carry out construction drawing design.
    7) Construction projects that meet the conditions for start-up of the National Planning Commission project and must be audited by the state regulations must perform audit procedures before they can start construction, organize construction, propose construction organization plans, and prepare for production according to the progress of the project.
    8) The construction project shall be completed according to the approved design contents, and shall be officially put into production or delivered after being tested and accepted.
    9) Post evaluation. After the construction project is completed and put into production, the construction unit shall summarize and make an evaluation of the production capacity, technical equipment level, production process plan, product quality, enterprise economic benefit, social benefit and environmental benefit of the project.

    Laser Crystal

    Laser crystals of various materials including Neodymium Doped Yttrium Aluminum Garnet (Nd:YAG), Yb-doped Yttrium Aluminum (Yb:YAG), Nd-doped Yttrium Orthovanadate ( Nd:YVO4 ), Nd-doped Gadolinium Orthovanadate ( Nd:GdVO4 ), Cr doped Yttrium Aluminum Garnet ( Cr4+:YAG ) and diffusion bonded composite crystal ( DBC crystal ) are available from Coupletech Co., Ltd.


    Coupletech could supply many kinds of laser crystal with larger dimension, higher damage threshold, higher conversion efficiency and higher reliability for higher power solid-state Laser applications. We have strict quality control and continuous innovation. Coupletech's various finished laser rods, laser crystal, slabs and thin wafers as well as supplying laser crystal with brewster's angle, which is widely for use in industrial, medical and scientific applications.

    laser crystal from coupletech


    S

    Yb:YAG Crystals,Nd:YAG Crystals,Nd:YVO4 Crystals,Cr:YAG Crystals,Diffusion Bonded Crystals

    Coupletech Co., Ltd. , https://www.coupletech.com

    Previous Post: Application of beneficiation equipment in barite beneficiation
    Next Post: Lead and zinc tailings utilization examples
    Home
    Recent Posts
    • Google Music will release the iOS platform App C…
    • Low cost, high strength, China's successful …
    • Study on Preparation of Feed Grade Defluorinated…
    • Sand and tin mine general industrial indicators …
    • New Process Technology of Low Grade Zinc Oxide H…
    • User-side power grid harmonic harm and active fi…
    • Application of beneficiation equipment in barite…
    • Sulphur mine mining development program
    • Lead and zinc tailings utilization examples
    • Measurement of waste non-ferrous metal resources
    • Research progress on molybdenum ore beneficiatio…
    • Classification of materials
    • New technology and new technology of jigging ben…
    • Cixi bearing foreign anti-dumping differential
    • What are the purposes and tasks of production ex…
    • Production example of cation reverse flotation o…
    • Use of rare earth element bismuth (Tb)
    • Warg custom wardrobe, teach you to distinguish p…
    • Application of atomization roasting in the prepa…
    • Grinding equipment and applications (8)