The time required for the stage to be launched

    All the stage of the mobile stage car can be fully developed. It is the time for the model selection of the mobile stage car and the time between the stage, the number of manual stages, and the manner in which the stage is unfolded. All have related relationships. How much time does it usually take for a mobile stage car to set up a stage?

    流动舞台车舞台展开所需时间.jpg

    1. The side-show mobile stage car is just one stage to be unfolded. The way the stage is unfolded is not only simpler, but also the most time-shortening way to expand, but because of the stage area that is unfolded on the side. Too small, so you need to start building the stage manually. Therefore, there is a correlation between the number of hand-made stages and the construction time of the stage. If a standard manual stage is used, the stage of a staged mobile stage car generally takes about three minutes.

    2. As the name of the double-deployment stage car is to unfold the two sides, the time taken by the stage will need to be more. If it is based on a standard mobile stage car, it is a fully automatic stage, so there is no manual stage. If it is not necessary to have a manual stage, then the time to build the stage by double-deploying a stage car is about three minutes to five minutes. If it is necessary to manually build the stage, then the manual stage requires additional calculation time.

    3. The three-stage mobile stage car is even more troublesome than the double exhibition and the side exhibition. The mere time to talk about the stage will be longer. For operators who are not familiar with the process at all, it may take more than ten minutes for the entire stage to unfold. If the understanding of each program operation is thorough, then it will take five minutes and it will take eight to fifteen minutes to build the stage.


    Heat Treatment Fixtures

    The company produced heat - resistant steel heat treatment furnace components, products sold throughout the country. In many years of continuous development and development, innovation of a number of new materials, further to meet the heat resistant leather and deformation of the use of requirements. Components can be produced from 0.1kg to 1500kg.

    Product specifications series, RX box furnace bottom plate, RJJ carburizing furnace horse boiler, charging frame, grid plate and other components from 15kw-105kw various specifications, can be supplied in a complete set.

    For heat treatment multi-purpose furnace, well furnace, continuous push rod furnace

    Product specifications series, RX box furnace bottom plate, RJJ carburizing furnace horse boiler, charging frame, grid plate and other components from 15kw-105kw various specifications, can be supplied in a complete set.

    It is suitable for casting and welding stirring fans of various furnace types

    Heat Treatment Fixtures,Heat Treatment Furnace Fixtures,Heat Treat Fixtures,Heat Treatment Fixtures Kit

    Jiangsu Huaye Special Steel Manufacturing Co., Ltd. , https://www.huayecasting.com

    Previous Post: Maintenance and Overhaul of Pump Mechanical Seals
    Next Post: Xichai’s energy saving and consumption reducing work creates new success
    Home
    Recent Posts
    • Excavator slewing motor failure and elimination
    • Yunnan: The development of specialty drugs
    • 1331-47 Front Bearing for PCB Drilling Machine S…
    • · Volkswagen said that there have been European…
    • Isuzu 700P Commercial Vehicle Launched
    • The Benefits of Straw Returning to Increase Fert…
    • Micro oil screw machine maintenance procedures
    • Igus® 100% lubrication-free, straight line tech…
    • The world's largest automated rail crane pro…
    • Quality and after-sales problems drag down the w…
    • Voice-based login started by joining Google Tech…
    • Collapsing electric butterfly valve fault and ma…
    • How to reduce the wear and tear of car tires and…
    • ·Low-speed growth into the new normal of China&…
    • Super new energy appears in the expo, humans wil…
    • Release valve installation and use of precaution…
    • Test report on extraction of copper from Xinjian…
    • Ankang iron ore optional test report
    • Bst-3850A Plastic Recycle Case Injection Molding…
    • The smog hits Xuande multifunctional dust suppre…